{"id":6951,"date":"2019-07-23T10:42:44","date_gmt":"2019-07-23T14:42:44","guid":{"rendered":"https:\/\/www.transy.edu\/1780\/?p=6951"},"modified":"2020-07-14T14:32:43","modified_gmt":"2020-07-14T18:32:43","slug":"new-transylvania-campus-center-to-start-taking-shape","status":"publish","type":"post","link":"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/","title":{"rendered":"New Transylvania Campus Center to start taking shape"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"810\" height=\"539\" src=\"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/2019\/07\/1-1-810x539.jpg\" alt=\"\" class=\"wp-image-6952\" srcset=\"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1-810x539.jpg 810w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1-350x233.jpg 350w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1-730x486.jpg 730w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1-768x511.jpg 768w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1-300x200.jpg 300w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1.jpg 1500w\" sizes=\"auto, (max-width: 810px) 100vw, 810px\" \/><\/figure>\n\n\n\n<p>The\nsteel frame of Transylvania University&#8217;s new Campus Center will soon rise from\nthe construction site along North Broadway.<\/p>\n\n\n\n<p>Work is proceeding on schedule for a fall 2020 opening. So far, workers have been focused on the lower level of the $30-million facility. Footings \u2014 which will help support the structure \u2014 and the basement&#8217;s concrete walls are expected to be finished by August. Also, lower-level plumbing installation is underway, and the construction site&#8217;s storm sewer work along Broadway is complete.<\/p>\n\n\n\n<p>Workers\nwill begin erecting the building&#8217;s aboveground steel frame by the beginning of\nnext month. Additionally, interior demolition of the existing William T. Young\nCampus Center will start by Aug. 5. The new, 97,710-square-foot Campus Center\nwill have 61,400 square feet of new construction and 36,310 square feet of\nspace renovated from the old building.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.transy.edu\/campus-center\/\">The new facility<\/a> will include event spaces for the Transylvania community and outside groups, a fitness center, classrooms, and dining areas like the Great Hall, which will seat up to 450 and remain open 24\/7 as a place for students to gather.<\/p>\n\n\n\n<p>Keep\ntrack of what&#8217;s going on with the&nbsp;<a href=\"https:\/\/www.transy.edu\/campus-center\/?progress=show\" target=\"_blank\" rel=\"noreferrer noopener\">construction cam<\/a>.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"810\" height=\"539\" src=\"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/2019\/07\/2-2-810x539.jpg\" alt=\"\" class=\"wp-image-6955\" srcset=\"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/2-2-810x539.jpg 810w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/2-2-350x233.jpg 350w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/2-2-730x486.jpg 730w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/2-2-768x511.jpg 768w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/2-2-300x200.jpg 300w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/2-2.jpg 1500w\" sizes=\"auto, (max-width: 810px) 100vw, 810px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The steel frame of Transylvania University&#8217;s new Campus Center will soon rise from the construction site along North Broadway.<\/p>\n","protected":false},"author":9,"featured_media":6952,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[78],"tags":[197,159,61],"feeds":[],"class_list":["post-6951","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-campus-updates","tag-campus-center","tag-campus-updates","tag-top-stories"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>New Transylvania Campus Center to start taking shape - Transylvania University - 1780<\/title>\n<meta name=\"description\" content=\"The steel frame of Transylvania University&#039;s new Campus Center will soon rise from the construction site along North Broadway.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New Transylvania Campus Center to start taking shape\" \/>\n<meta property=\"og:description\" content=\"The steel frame of Transylvania University&#039;s new Campus Center will soon rise from the construction site along North Broadway.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/\" \/>\n<meta property=\"og:site_name\" content=\"1780\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/transylvaniauniversity\" \/>\n<meta property=\"article:published_time\" content=\"2019-07-23T14:42:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-07-14T18:32:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1-1200x630.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"John Friedlein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@transy\" \/>\n<meta name=\"twitter:site\" content=\"@transy\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"John Friedlein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/07\\\/new-transylvania-campus-center-to-start-taking-shape\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/07\\\/new-transylvania-campus-center-to-start-taking-shape\\\/\"},\"author\":{\"name\":\"John Friedlein\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/#\\\/schema\\\/person\\\/adc717b348f5af5ecebcb90ae7afe23c\"},\"headline\":\"New Transylvania Campus Center to start taking shape\",\"datePublished\":\"2019-07-23T14:42:44+00:00\",\"dateModified\":\"2020-07-14T18:32:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/07\\\/new-transylvania-campus-center-to-start-taking-shape\\\/\"},\"wordCount\":194,\"image\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/07\\\/new-transylvania-campus-center-to-start-taking-shape\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/wp-content\\\/uploads\\\/sites\\\/14\\\/2019\\\/07\\\/1-1.jpg\",\"keywords\":[\"Campus Center\",\"Campus Updates\",\"Top Stories\"],\"articleSection\":[\"Campus Updates\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/07\\\/new-transylvania-campus-center-to-start-taking-shape\\\/\",\"url\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/07\\\/new-transylvania-campus-center-to-start-taking-shape\\\/\",\"name\":\"New Transylvania Campus Center to start taking shape - Transylvania University - 1780\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/07\\\/new-transylvania-campus-center-to-start-taking-shape\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/07\\\/new-transylvania-campus-center-to-start-taking-shape\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/wp-content\\\/uploads\\\/sites\\\/14\\\/2019\\\/07\\\/1-1.jpg\",\"datePublished\":\"2019-07-23T14:42:44+00:00\",\"dateModified\":\"2020-07-14T18:32:43+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/#\\\/schema\\\/person\\\/adc717b348f5af5ecebcb90ae7afe23c\"},\"description\":\"The steel frame of Transylvania University's new Campus Center will soon rise from the construction site along North Broadway.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/07\\\/new-transylvania-campus-center-to-start-taking-shape\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/07\\\/new-transylvania-campus-center-to-start-taking-shape\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/07\\\/new-transylvania-campus-center-to-start-taking-shape\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/wp-content\\\/uploads\\\/sites\\\/14\\\/2019\\\/07\\\/1-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/wp-content\\\/uploads\\\/sites\\\/14\\\/2019\\\/07\\\/1-1.jpg\",\"width\":1500,\"height\":998,\"caption\":\"Construction site\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/07\\\/new-transylvania-campus-center-to-start-taking-shape\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New Transylvania Campus Center to start taking shape\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/#website\",\"url\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/\",\"name\":\"1780\",\"description\":\"The Official Blog of Transylvania University\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/#\\\/schema\\\/person\\\/adc717b348f5af5ecebcb90ae7afe23c\",\"name\":\"John Friedlein\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"New Transylvania Campus Center to start taking shape - Transylvania University - 1780","description":"The steel frame of Transylvania University's new Campus Center will soon rise from the construction site along North Broadway.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/","og_locale":"en_US","og_type":"article","og_title":"New Transylvania Campus Center to start taking shape","og_description":"The steel frame of Transylvania University's new Campus Center will soon rise from the construction site along North Broadway.","og_url":"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/","og_site_name":"1780","article_publisher":"https:\/\/www.facebook.com\/transylvaniauniversity","article_published_time":"2019-07-23T14:42:44+00:00","article_modified_time":"2020-07-14T18:32:43+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1-1200x630.jpg","type":"image\/jpeg"}],"author":"John Friedlein","twitter_card":"summary_large_image","twitter_creator":"@transy","twitter_site":"@transy","twitter_misc":{"Written by":"John Friedlein","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/#article","isPartOf":{"@id":"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/"},"author":{"name":"John Friedlein","@id":"https:\/\/www.transy.edu\/1780\/#\/schema\/person\/adc717b348f5af5ecebcb90ae7afe23c"},"headline":"New Transylvania Campus Center to start taking shape","datePublished":"2019-07-23T14:42:44+00:00","dateModified":"2020-07-14T18:32:43+00:00","mainEntityOfPage":{"@id":"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/"},"wordCount":194,"image":{"@id":"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/#primaryimage"},"thumbnailUrl":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1.jpg","keywords":["Campus Center","Campus Updates","Top Stories"],"articleSection":["Campus Updates"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/","url":"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/","name":"New Transylvania Campus Center to start taking shape - Transylvania University - 1780","isPartOf":{"@id":"https:\/\/www.transy.edu\/1780\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/#primaryimage"},"image":{"@id":"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/#primaryimage"},"thumbnailUrl":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1.jpg","datePublished":"2019-07-23T14:42:44+00:00","dateModified":"2020-07-14T18:32:43+00:00","author":{"@id":"https:\/\/www.transy.edu\/1780\/#\/schema\/person\/adc717b348f5af5ecebcb90ae7afe23c"},"description":"The steel frame of Transylvania University's new Campus Center will soon rise from the construction site along North Broadway.","breadcrumb":{"@id":"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/#primaryimage","url":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1.jpg","contentUrl":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1.jpg","width":1500,"height":998,"caption":"Construction site"},{"@type":"BreadcrumbList","@id":"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.transy.edu\/1780\/"},{"@type":"ListItem","position":2,"name":"New Transylvania Campus Center to start taking shape"}]},{"@type":"WebSite","@id":"https:\/\/www.transy.edu\/1780\/#website","url":"https:\/\/www.transy.edu\/1780\/","name":"1780","description":"The Official Blog of Transylvania University","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.transy.edu\/1780\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.transy.edu\/1780\/#\/schema\/person\/adc717b348f5af5ecebcb90ae7afe23c","name":"John Friedlein"}]}},"jetpack_featured_media_url":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":7873,"url":"https:\/\/www.transy.edu\/1780\/2019\/09\/steel-structure-of-new-transylvania-campus-center-nearly-complete\/","url_meta":{"origin":6951,"position":0},"title":"Steel structure of new Transylvania Campus Center nearly complete","author":"John Friedlein","date":"September 16, 2019","format":false,"excerpt":"People traveling along North Broadway are getting a glimpse of what our new Campus Center will look like now that most of the steel frame is in place. Once work on the steel structure wraps up on the $29.6 million facility, the most notable progress that passersby will notice is\u2026","rel":"","context":"In &quot;Campus Updates&quot;","block_context":{"text":"Campus Updates","link":"https:\/\/www.transy.edu\/1780\/category\/campus-updates\/"},"img":{"alt_text":"Campus Center construction site","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/09\/190916_CCConstruction_DSC_4544-2.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/09\/190916_CCConstruction_DSC_4544-2.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/09\/190916_CCConstruction_DSC_4544-2.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/09\/190916_CCConstruction_DSC_4544-2.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/09\/190916_CCConstruction_DSC_4544-2.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/09\/190916_CCConstruction_DSC_4544-2.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":8438,"url":"https:\/\/www.transy.edu\/1780\/2019\/10\/transylvania-campus-center-project-full-steam-ahead-with-eye-toward-winter\/","url_meta":{"origin":6951,"position":1},"title":"Transylvania Campus Center project full steam ahead with eye toward winter","author":"John Friedlein","date":"October 24, 2019","format":false,"excerpt":"Transylvania University is taking advantage of these pleasant fall days to get its future Campus Center enclosed so work can continue on the interior when winter weather arrives.","rel":"","context":"In &quot;Campus Updates&quot;","block_context":{"text":"Campus Updates","link":"https:\/\/www.transy.edu\/1780\/category\/campus-updates\/"},"img":{"alt_text":"Campus Center construction site","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/10\/ccfeature.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/10\/ccfeature.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/10\/ccfeature.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/10\/ccfeature.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/10\/ccfeature.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/10\/ccfeature.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":5553,"url":"https:\/\/www.transy.edu\/1780\/2019\/04\/demolition-complete-construction-underway-on-new-campus-center-at-transy\/","url_meta":{"origin":6951,"position":2},"title":"Demolition complete, construction underway on new Campus Center at Transy","author":"Megan Moloney","date":"April 17, 2019","format":false,"excerpt":"Behind the construction fence on North Broadway, progress is being made on Transylvania University\u2019s new Campus Center.","rel":"","context":"In &quot;Campus Updates&quot;","block_context":{"text":"Campus Updates","link":"https:\/\/www.transy.edu\/1780\/category\/campus-updates\/"},"img":{"alt_text":"Transylvania Campus Center construction site","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/04\/campus-center.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/04\/campus-center.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/04\/campus-center.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/04\/campus-center.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/04\/campus-center.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/04\/campus-center.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":4628,"url":"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/","url_meta":{"origin":6951,"position":3},"title":"Transylvania Campus Center construction to begin by March","author":"John Friedlein","date":"February 8, 2019","format":false,"excerpt":"Motorists traveling along North Broadway soon will see significant signs of progress with Transylvania University\u2019s new Campus Center project.","rel":"","context":"In &quot;Campus Updates&quot;","block_context":{"text":"Campus Updates","link":"https:\/\/www.transy.edu\/1780\/category\/campus-updates\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":12251,"url":"https:\/\/www.transy.edu\/1780\/2020\/06\/transylvania-wrapping-up-construction-of-new-campus-center\/","url_meta":{"origin":6951,"position":4},"title":"Transylvania wrapping up construction of new campus center","author":"John Friedlein","date":"June 17, 2020","format":false,"excerpt":"Over the next couple of months, Transylvania will be putting the finishing touches on its new W.T. Young Campus Center \u2014 which will be ready for students when they return this fall.","rel":"","context":"In &quot;Campus Updates&quot;","block_context":{"text":"Campus Updates","link":"https:\/\/www.transy.edu\/1780\/category\/campus-updates\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2020\/06\/ccmain.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2020\/06\/ccmain.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2020\/06\/ccmain.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2020\/06\/ccmain.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2020\/06\/ccmain.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2020\/06\/ccmain.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":18344,"url":"https:\/\/www.transy.edu\/1780\/2021\/10\/new-william-t-young-campus-center-celebrated-as-core-of-campus-life\/","url_meta":{"origin":6951,"position":5},"title":"New William T. Young Campus Center celebrated as core of campus life","author":"Megan Moloney","date":"October 22, 2021","format":false,"excerpt":"The $30 million Campus Center on North Broadway, a mix of new construction and renovation of the previous student center, bridges the residential and academic sides of Transylvania.\u00a0","rel":"","context":"In &quot;Campus Updates&quot;","block_context":{"text":"Campus Updates","link":"https:\/\/www.transy.edu\/1780\/category\/campus-updates\/"},"img":{"alt_text":"ribbon cutting","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2021\/10\/DSC_6808.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2021\/10\/DSC_6808.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2021\/10\/DSC_6808.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2021\/10\/DSC_6808.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2021\/10\/DSC_6808.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2021\/10\/DSC_6808.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/posts\/6951","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/comments?post=6951"}],"version-history":[{"count":0,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/posts\/6951\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/media\/6952"}],"wp:attachment":[{"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/media?parent=6951"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/categories?post=6951"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/tags?post=6951"},{"taxonomy":"feeds","embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/feeds?post=6951"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}