{"id":4628,"date":"2019-02-08T16:02:39","date_gmt":"2019-02-08T21:02:39","guid":{"rendered":"https:\/\/www.transy.edu\/1780\/?p=4628"},"modified":"2020-07-14T14:42:04","modified_gmt":"2020-07-14T18:42:04","slug":"transylvania-campus-center-construction-to-begin-by-march","status":"publish","type":"post","link":"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/","title":{"rendered":"Transylvania Campus Center construction to begin by March"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"810\" height=\"443\" src=\"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/2019\/02\/banner2-810x443.jpg\" alt=\"\" class=\"wp-image-4635\" srcset=\"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2-810x443.jpg 810w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2-350x191.jpg 350w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2-730x399.jpg 730w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2-768x420.jpg 768w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2-1536x839.jpg 1536w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2-2048x1119.jpg 2048w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2-300x164.jpg 300w\" sizes=\"auto, (max-width: 810px) 100vw, 810px\" \/><\/figure>\n\n\n\n<p>Motorists traveling along North Broadway soon will see\nsignificant signs of progress with Transylvania University\u2019s new Campus Center\nproject.<\/p>\n\n\n\n<p>Construction fences and banners are up, and the 60-year-old\nForrer Residence Hall will be demolished by the end of the month. <\/p>\n\n\n\n<p>Crews already have taken down the back of Forrer and soon\nwill demolish the front. Construction on the $30 million Campus Center will\nbegin immediately after demolition.<\/p>\n\n\n\n<p>The new 97,710-square-foot building (61,400 square feet of\nnew construction and 36,310 square feet of renovated space) will feature event\nspaces for campus and outside groups, classrooms and dining facilities including\nthe Great Hall, which will seat up to 450 and remain open 24\/7 as a place for\nstudents to gather.<\/p>\n\n\n\n<p>The new Campus Center is expected to open in September 2020.<\/p>\n\n\n\n<p>\u201cIt will be the bridge between the academic and residential\nsides of campus,\u201d said Marc Mathews, vice president for finance and business.\n\u201cIt will be a hub that everybody goes in every day.\u201d In addition to\nTransylvania students, faculty, staff and the Lexington community will use the\nnew facility.<\/p>\n\n\n\n<p>The project also will include renovations to the existing\nWilliam T. Young Campus Center, most of which will remain open until next\nsummer\u2014when everything except the pool will close.<\/p>\n\n\n\n<p>To accommodate construction, the university has made changes\nthat include office moves and expansion of other dining spaces.<\/p>\n\n\n\n<p>Check out the renderings of the future Campus Center, and\nget more details <a href=\"https:\/\/www.transy.edu\/campus-center\/\">here<\/a>.<\/p>\n\n\n\n<p>The project\u2019s general contractor is Lexington\u2019s\nCongleton-Hacker.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Motorists traveling along North Broadway soon will see significant signs of progress with Transylvania University\u2019s new Campus Center project.<\/p>\n","protected":false},"author":9,"featured_media":4635,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[78],"tags":[197],"feeds":[],"class_list":["post-4628","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-campus-updates","tag-campus-center"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Transylvania Campus Center construction to begin by March - Transylvania University - 1780<\/title>\n<meta name=\"description\" content=\"Motorists traveling along North Broadway soon will see significant signs of progress with Transylvania University\u2019s new Campus Center project.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Transylvania Campus Center construction to begin by March\" \/>\n<meta property=\"og:description\" content=\"Motorists traveling along North Broadway soon will see significant signs of progress with Transylvania University\u2019s new Campus Center project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/\" \/>\n<meta property=\"og:site_name\" content=\"1780\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/transylvaniauniversity\" \/>\n<meta property=\"article:published_time\" content=\"2019-02-08T21:02:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-07-14T18:42:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2-1200x630.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"John Friedlein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@transy\" \/>\n<meta name=\"twitter:site\" content=\"@transy\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"John Friedlein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/02\\\/transylvania-campus-center-construction-to-begin-by-march\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/02\\\/transylvania-campus-center-construction-to-begin-by-march\\\/\"},\"author\":{\"name\":\"John Friedlein\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/#\\\/schema\\\/person\\\/adc717b348f5af5ecebcb90ae7afe23c\"},\"headline\":\"Transylvania Campus Center construction to begin by March\",\"datePublished\":\"2019-02-08T21:02:39+00:00\",\"dateModified\":\"2020-07-14T18:42:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/02\\\/transylvania-campus-center-construction-to-begin-by-march\\\/\"},\"wordCount\":252,\"image\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/02\\\/transylvania-campus-center-construction-to-begin-by-march\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/wp-content\\\/uploads\\\/sites\\\/14\\\/2019\\\/02\\\/banner2.jpg\",\"keywords\":[\"Campus Center\"],\"articleSection\":[\"Campus Updates\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/02\\\/transylvania-campus-center-construction-to-begin-by-march\\\/\",\"url\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/02\\\/transylvania-campus-center-construction-to-begin-by-march\\\/\",\"name\":\"Transylvania Campus Center construction to begin by March - Transylvania University - 1780\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/02\\\/transylvania-campus-center-construction-to-begin-by-march\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/02\\\/transylvania-campus-center-construction-to-begin-by-march\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/wp-content\\\/uploads\\\/sites\\\/14\\\/2019\\\/02\\\/banner2.jpg\",\"datePublished\":\"2019-02-08T21:02:39+00:00\",\"dateModified\":\"2020-07-14T18:42:04+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/#\\\/schema\\\/person\\\/adc717b348f5af5ecebcb90ae7afe23c\"},\"description\":\"Motorists traveling along North Broadway soon will see significant signs of progress with Transylvania University\u2019s new Campus Center project.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/02\\\/transylvania-campus-center-construction-to-begin-by-march\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/02\\\/transylvania-campus-center-construction-to-begin-by-march\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/02\\\/transylvania-campus-center-construction-to-begin-by-march\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/wp-content\\\/uploads\\\/sites\\\/14\\\/2019\\\/02\\\/banner2.jpg\",\"contentUrl\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/wp-content\\\/uploads\\\/sites\\\/14\\\/2019\\\/02\\\/banner2.jpg\",\"width\":2500,\"height\":1366},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2019\\\/02\\\/transylvania-campus-center-construction-to-begin-by-march\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Transylvania Campus Center construction to begin by March\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/#website\",\"url\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/\",\"name\":\"1780\",\"description\":\"The Official Blog of Transylvania University\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/#\\\/schema\\\/person\\\/adc717b348f5af5ecebcb90ae7afe23c\",\"name\":\"John Friedlein\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Transylvania Campus Center construction to begin by March - Transylvania University - 1780","description":"Motorists traveling along North Broadway soon will see significant signs of progress with Transylvania University\u2019s new Campus Center project.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/","og_locale":"en_US","og_type":"article","og_title":"Transylvania Campus Center construction to begin by March","og_description":"Motorists traveling along North Broadway soon will see significant signs of progress with Transylvania University\u2019s new Campus Center project.","og_url":"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/","og_site_name":"1780","article_publisher":"https:\/\/www.facebook.com\/transylvaniauniversity","article_published_time":"2019-02-08T21:02:39+00:00","article_modified_time":"2020-07-14T18:42:04+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2-1200x630.jpg","type":"image\/jpeg"}],"author":"John Friedlein","twitter_card":"summary_large_image","twitter_creator":"@transy","twitter_site":"@transy","twitter_misc":{"Written by":"John Friedlein","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/#article","isPartOf":{"@id":"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/"},"author":{"name":"John Friedlein","@id":"https:\/\/www.transy.edu\/1780\/#\/schema\/person\/adc717b348f5af5ecebcb90ae7afe23c"},"headline":"Transylvania Campus Center construction to begin by March","datePublished":"2019-02-08T21:02:39+00:00","dateModified":"2020-07-14T18:42:04+00:00","mainEntityOfPage":{"@id":"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/"},"wordCount":252,"image":{"@id":"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/#primaryimage"},"thumbnailUrl":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2.jpg","keywords":["Campus Center"],"articleSection":["Campus Updates"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/","url":"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/","name":"Transylvania Campus Center construction to begin by March - Transylvania University - 1780","isPartOf":{"@id":"https:\/\/www.transy.edu\/1780\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/#primaryimage"},"image":{"@id":"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/#primaryimage"},"thumbnailUrl":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2.jpg","datePublished":"2019-02-08T21:02:39+00:00","dateModified":"2020-07-14T18:42:04+00:00","author":{"@id":"https:\/\/www.transy.edu\/1780\/#\/schema\/person\/adc717b348f5af5ecebcb90ae7afe23c"},"description":"Motorists traveling along North Broadway soon will see significant signs of progress with Transylvania University\u2019s new Campus Center project.","breadcrumb":{"@id":"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/#primaryimage","url":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2.jpg","contentUrl":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2.jpg","width":2500,"height":1366},{"@type":"BreadcrumbList","@id":"https:\/\/www.transy.edu\/1780\/2019\/02\/transylvania-campus-center-construction-to-begin-by-march\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.transy.edu\/1780\/"},{"@type":"ListItem","position":2,"name":"Transylvania Campus Center construction to begin by March"}]},{"@type":"WebSite","@id":"https:\/\/www.transy.edu\/1780\/#website","url":"https:\/\/www.transy.edu\/1780\/","name":"1780","description":"The Official Blog of Transylvania University","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.transy.edu\/1780\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.transy.edu\/1780\/#\/schema\/person\/adc717b348f5af5ecebcb90ae7afe23c","name":"John Friedlein"}]}},"jetpack_featured_media_url":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/02\/banner2.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":5553,"url":"https:\/\/www.transy.edu\/1780\/2019\/04\/demolition-complete-construction-underway-on-new-campus-center-at-transy\/","url_meta":{"origin":4628,"position":0},"title":"Demolition complete, construction underway on new Campus Center at Transy","author":"Megan Moloney","date":"April 17, 2019","format":false,"excerpt":"Behind the construction fence on North Broadway, progress is being made on Transylvania University\u2019s new Campus Center.","rel":"","context":"In &quot;Campus Updates&quot;","block_context":{"text":"Campus Updates","link":"https:\/\/www.transy.edu\/1780\/category\/campus-updates\/"},"img":{"alt_text":"Transylvania Campus Center construction site","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/04\/campus-center.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/04\/campus-center.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/04\/campus-center.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/04\/campus-center.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/04\/campus-center.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/04\/campus-center.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":6951,"url":"https:\/\/www.transy.edu\/1780\/2019\/07\/new-transylvania-campus-center-to-start-taking-shape\/","url_meta":{"origin":4628,"position":1},"title":"New Transylvania Campus Center to start taking shape","author":"John Friedlein","date":"July 23, 2019","format":false,"excerpt":"The steel frame of Transylvania University's new Campus Center will soon rise from the construction site along North Broadway.","rel":"","context":"In &quot;Campus Updates&quot;","block_context":{"text":"Campus Updates","link":"https:\/\/www.transy.edu\/1780\/category\/campus-updates\/"},"img":{"alt_text":"Construction site","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/07\/1-1.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":7873,"url":"https:\/\/www.transy.edu\/1780\/2019\/09\/steel-structure-of-new-transylvania-campus-center-nearly-complete\/","url_meta":{"origin":4628,"position":2},"title":"Steel structure of new Transylvania Campus Center nearly complete","author":"John Friedlein","date":"September 16, 2019","format":false,"excerpt":"People traveling along North Broadway are getting a glimpse of what our new Campus Center will look like now that most of the steel frame is in place. Once work on the steel structure wraps up on the $29.6 million facility, the most notable progress that passersby will notice is\u2026","rel":"","context":"In &quot;Campus Updates&quot;","block_context":{"text":"Campus Updates","link":"https:\/\/www.transy.edu\/1780\/category\/campus-updates\/"},"img":{"alt_text":"Campus Center construction site","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/09\/190916_CCConstruction_DSC_4544-2.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/09\/190916_CCConstruction_DSC_4544-2.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/09\/190916_CCConstruction_DSC_4544-2.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/09\/190916_CCConstruction_DSC_4544-2.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/09\/190916_CCConstruction_DSC_4544-2.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/09\/190916_CCConstruction_DSC_4544-2.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":4179,"url":"https:\/\/www.transy.edu\/1780\/2018\/12\/transylvanias-29-6-million-campus-center-project-underway\/","url_meta":{"origin":4628,"position":3},"title":"Transylvania\u2019s $29.6 million Campus Center project underway","author":"John Friedlein","date":"December 19, 2018","format":false,"excerpt":"A low silt fence between Transylvania University\u2019s Forrer Hall and North Broadway is a small sign of big changes to come. Installed at the beginning of winter break, the fence will stop soil runoff as crews take down the 60-year-old residence hall to make way for a new $29.6 million\u2026","rel":"","context":"In &quot;Campus Updates&quot;","block_context":{"text":"Campus Updates","link":"https:\/\/www.transy.edu\/1780\/category\/campus-updates\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2018\/12\/ccupdate.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2018\/12\/ccupdate.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2018\/12\/ccupdate.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2018\/12\/ccupdate.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2018\/12\/ccupdate.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2018\/12\/ccupdate.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":12251,"url":"https:\/\/www.transy.edu\/1780\/2020\/06\/transylvania-wrapping-up-construction-of-new-campus-center\/","url_meta":{"origin":4628,"position":4},"title":"Transylvania wrapping up construction of new campus center","author":"John Friedlein","date":"June 17, 2020","format":false,"excerpt":"Over the next couple of months, Transylvania will be putting the finishing touches on its new W.T. Young Campus Center \u2014 which will be ready for students when they return this fall.","rel":"","context":"In &quot;Campus Updates&quot;","block_context":{"text":"Campus Updates","link":"https:\/\/www.transy.edu\/1780\/category\/campus-updates\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2020\/06\/ccmain.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2020\/06\/ccmain.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2020\/06\/ccmain.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2020\/06\/ccmain.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2020\/06\/ccmain.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2020\/06\/ccmain.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":4301,"url":"https:\/\/www.transy.edu\/1780\/2019\/01\/transylvania-dining-expands-to-accommodate-campus-center-construction\/","url_meta":{"origin":4628,"position":5},"title":"Transylvania expands Rafskeller to accommodate Campus Center construction","author":"John Friedlein","date":"January 9, 2019","format":false,"excerpt":"Transylvania University has expanded its Rafskeller Grill area to accommodate campus dining needs during the construction of a new, $29.6 million Campus Center. The renovated dining space, which opened this week as students returned for the beginning of winter term, provides more seating than the previous facility in Forrer Hall.\u2026","rel":"","context":"In &quot;Campus Updates&quot;","block_context":{"text":"Campus Updates","link":"https:\/\/www.transy.edu\/1780\/category\/campus-updates\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/01\/raf2-1.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/01\/raf2-1.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/01\/raf2-1.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/01\/raf2-1.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/01\/raf2-1.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/01\/raf2-1.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/posts\/4628","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/comments?post=4628"}],"version-history":[{"count":0,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/posts\/4628\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/media\/4635"}],"wp:attachment":[{"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/media?parent=4628"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/categories?post=4628"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/tags?post=4628"},{"taxonomy":"feeds","embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/feeds?post=4628"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}