{"id":19899,"date":"2022-05-06T11:16:24","date_gmt":"2022-05-06T15:16:24","guid":{"rendered":"https:\/\/www.transy.edu\/1780\/?p=19899"},"modified":"2022-05-06T11:16:48","modified_gmt":"2022-05-06T15:16:48","slug":"transylvania-finishing-up-old-morrison-step-replacement-project","status":"publish","type":"post","link":"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/","title":{"rendered":"Transylvania finishing up Old Morrison step replacement project"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"810\" height=\"546\" src=\"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_om-steps-810x546.jpg\" alt=\"exterior of a building\" class=\"wp-image-19903\" srcset=\"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_om-steps-810x546.jpg 810w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_om-steps-350x236.jpg 350w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_om-steps-730x492.jpg 730w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_om-steps-768x518.jpg 768w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_om-steps-300x202.jpg 300w, https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_om-steps.jpg 1200w\" sizes=\"auto, (max-width: 810px) 100vw, 810px\" \/><\/figure>\n\n\n\n<p>In time for the May 28 commencement, Transylvania University is wrapping up improvements to the front of its historic Old Morrison administration building \u2014 including replacement of the limestone steps.<\/p>\n\n\n\n<p>The last step was put in place a few weeks ago, and then the stones were sealed, waterproofed, tuck-pointed and cleaned. The project also included sidewalk work and replacing the concrete slabs on either side of the main entrance. Additionally, the large oaks flanking the building were trimmed to help showcase the steps and columns. Other finishing touches include painting the front walls.<\/p>\n\n\n\n<p>&#8220;I am very happy to have been given the opportunity to direct this project and bring the focal point of this historical building back to a condition that Transy can be proud of,&#8221; Director of Facilities Management Danny Knox said. &#8220;The quantity results would not have been possible without Gilpin Masonry&#8221; (which also replaced the state capitol steps in Frankfort).<\/p>\n\n\n\n<p>The construction area will remain blocked off until commencement.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.nps.gov\/nr\/travel\/lexington\/olm.htm\">Old Morrison<\/a> graces the Lexington city seal and is the site of many events for the school community and beyond, including the annual PumpkinMania. It\u2019s also a traditional stop for campus tours.<\/p>\n\n\n\n<p>The building is a registered National Historic Landmark and has served a variety of purposes throughout its history, including as a Civil War hospital.<\/p>\n\n\n\n<p>In replacing the decaying steps from the ground level to the second-story entrance, the goal was to use the same type of materials and retain the look of the original building, which was constructed in the 1830s.&nbsp;<\/p>\n\n\n\n<p>The Lexington Historical Society was consulted on the project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In time for the May 28 commencement, Transylvania is wrapping up improvements to the front of its historic Old Morrison administration building \u2014 including replacement of the limestone steps.<\/p>\n","protected":false},"author":9,"featured_media":19903,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"6569,1716,15267,16117,16556,1807","_relevanssi_noindex_reason":"","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[78],"tags":[266,61],"feeds":[],"class_list":["post-19899","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-campus-updates","tag-old-morrison","tag-top-stories"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Transylvania finishing up Old Morrison step replacement project - Transylvania University - 1780<\/title>\n<meta name=\"description\" content=\"In time for the May 28 commencement, Transylvania is wrapping up improvements to the front of its historic Old Morrison administration building \u2014 including replacement of the limestone steps.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Transylvania finishing up Old Morrison step replacement project\" \/>\n<meta property=\"og:description\" content=\"In time for the May 28 commencement, Transylvania is wrapping up improvements to the front of its historic Old Morrison administration building \u2014 including replacement of the limestone steps.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/\" \/>\n<meta property=\"og:site_name\" content=\"1780\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/transylvaniauniversity\" \/>\n<meta property=\"article:published_time\" content=\"2022-05-06T15:16:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-05-06T15:16:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_om-steps-1200x630.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"John Friedlein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_om-stpes_tweet.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@transy\" \/>\n<meta name=\"twitter:site\" content=\"@transy\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"John Friedlein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2022\\\/05\\\/transylvania-finishing-up-old-morrison-step-replacement-project\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2022\\\/05\\\/transylvania-finishing-up-old-morrison-step-replacement-project\\\/\"},\"author\":{\"name\":\"John Friedlein\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/#\\\/schema\\\/person\\\/adc717b348f5af5ecebcb90ae7afe23c\"},\"headline\":\"Transylvania finishing up Old Morrison step replacement project\",\"datePublished\":\"2022-05-06T15:16:24+00:00\",\"dateModified\":\"2022-05-06T15:16:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2022\\\/05\\\/transylvania-finishing-up-old-morrison-step-replacement-project\\\/\"},\"wordCount\":272,\"image\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2022\\\/05\\\/transylvania-finishing-up-old-morrison-step-replacement-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/wp-content\\\/uploads\\\/sites\\\/14\\\/2022\\\/05\\\/transylvania_om-steps.jpg\",\"keywords\":[\"Old Morrison\",\"Top Stories\"],\"articleSection\":[\"Campus Updates\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2022\\\/05\\\/transylvania-finishing-up-old-morrison-step-replacement-project\\\/\",\"url\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2022\\\/05\\\/transylvania-finishing-up-old-morrison-step-replacement-project\\\/\",\"name\":\"Transylvania finishing up Old Morrison step replacement project - Transylvania University - 1780\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2022\\\/05\\\/transylvania-finishing-up-old-morrison-step-replacement-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2022\\\/05\\\/transylvania-finishing-up-old-morrison-step-replacement-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/wp-content\\\/uploads\\\/sites\\\/14\\\/2022\\\/05\\\/transylvania_om-steps.jpg\",\"datePublished\":\"2022-05-06T15:16:24+00:00\",\"dateModified\":\"2022-05-06T15:16:48+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/#\\\/schema\\\/person\\\/adc717b348f5af5ecebcb90ae7afe23c\"},\"description\":\"In time for the May 28 commencement, Transylvania is wrapping up improvements to the front of its historic Old Morrison administration building \u2014 including replacement of the limestone steps.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2022\\\/05\\\/transylvania-finishing-up-old-morrison-step-replacement-project\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2022\\\/05\\\/transylvania-finishing-up-old-morrison-step-replacement-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2022\\\/05\\\/transylvania-finishing-up-old-morrison-step-replacement-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/wp-content\\\/uploads\\\/sites\\\/14\\\/2022\\\/05\\\/transylvania_om-steps.jpg\",\"contentUrl\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/wp-content\\\/uploads\\\/sites\\\/14\\\/2022\\\/05\\\/transylvania_om-steps.jpg\",\"width\":1200,\"height\":809,\"caption\":\"building exterior\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/2022\\\/05\\\/transylvania-finishing-up-old-morrison-step-replacement-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Transylvania finishing up Old Morrison step replacement project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/#website\",\"url\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/\",\"name\":\"1780\",\"description\":\"The Official Blog of Transylvania University\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.transy.edu\\\/1780\\\/#\\\/schema\\\/person\\\/adc717b348f5af5ecebcb90ae7afe23c\",\"name\":\"John Friedlein\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Transylvania finishing up Old Morrison step replacement project - Transylvania University - 1780","description":"In time for the May 28 commencement, Transylvania is wrapping up improvements to the front of its historic Old Morrison administration building \u2014 including replacement of the limestone steps.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/","og_locale":"en_US","og_type":"article","og_title":"Transylvania finishing up Old Morrison step replacement project","og_description":"In time for the May 28 commencement, Transylvania is wrapping up improvements to the front of its historic Old Morrison administration building \u2014 including replacement of the limestone steps.","og_url":"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/","og_site_name":"1780","article_publisher":"https:\/\/www.facebook.com\/transylvaniauniversity","article_published_time":"2022-05-06T15:16:24+00:00","article_modified_time":"2022-05-06T15:16:48+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_om-steps-1200x630.jpg","type":"image\/jpeg"}],"author":"John Friedlein","twitter_card":"summary_large_image","twitter_image":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_om-stpes_tweet.jpg","twitter_creator":"@transy","twitter_site":"@transy","twitter_misc":{"Written by":"John Friedlein","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/#article","isPartOf":{"@id":"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/"},"author":{"name":"John Friedlein","@id":"https:\/\/www.transy.edu\/1780\/#\/schema\/person\/adc717b348f5af5ecebcb90ae7afe23c"},"headline":"Transylvania finishing up Old Morrison step replacement project","datePublished":"2022-05-06T15:16:24+00:00","dateModified":"2022-05-06T15:16:48+00:00","mainEntityOfPage":{"@id":"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/"},"wordCount":272,"image":{"@id":"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/#primaryimage"},"thumbnailUrl":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_om-steps.jpg","keywords":["Old Morrison","Top Stories"],"articleSection":["Campus Updates"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/","url":"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/","name":"Transylvania finishing up Old Morrison step replacement project - Transylvania University - 1780","isPartOf":{"@id":"https:\/\/www.transy.edu\/1780\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/#primaryimage"},"image":{"@id":"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/#primaryimage"},"thumbnailUrl":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_om-steps.jpg","datePublished":"2022-05-06T15:16:24+00:00","dateModified":"2022-05-06T15:16:48+00:00","author":{"@id":"https:\/\/www.transy.edu\/1780\/#\/schema\/person\/adc717b348f5af5ecebcb90ae7afe23c"},"description":"In time for the May 28 commencement, Transylvania is wrapping up improvements to the front of its historic Old Morrison administration building \u2014 including replacement of the limestone steps.","breadcrumb":{"@id":"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/#primaryimage","url":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_om-steps.jpg","contentUrl":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_om-steps.jpg","width":1200,"height":809,"caption":"building exterior"},{"@type":"BreadcrumbList","@id":"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-finishing-up-old-morrison-step-replacement-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.transy.edu\/1780\/"},{"@type":"ListItem","position":2,"name":"Transylvania finishing up Old Morrison step replacement project"}]},{"@type":"WebSite","@id":"https:\/\/www.transy.edu\/1780\/#website","url":"https:\/\/www.transy.edu\/1780\/","name":"1780","description":"The Official Blog of Transylvania University","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.transy.edu\/1780\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.transy.edu\/1780\/#\/schema\/person\/adc717b348f5af5ecebcb90ae7afe23c","name":"John Friedlein"}]}},"jetpack_featured_media_url":"https:\/\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_om-steps.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":18599,"url":"https:\/\/www.transy.edu\/1780\/2021\/11\/transylvania-replacing-steps-in-front-of-historic-old-morrison\/","url_meta":{"origin":19899,"position":0},"title":"Transylvania replacing steps in front of historic Old Morrison","author":"John Friedlein","date":"November 19, 2021","format":false,"excerpt":"Beginning next month, Transylvania will replace the limestone steps in front of its historic Old Morrison administration building.","rel":"","context":"In &quot;Campus Updates&quot;","block_context":{"text":"Campus Updates","link":"https:\/\/www.transy.edu\/1780\/category\/campus-updates\/"},"img":{"alt_text":"building","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2021\/11\/transylvania_old-morrison_feature.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2021\/11\/transylvania_old-morrison_feature.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2021\/11\/transylvania_old-morrison_feature.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2021\/11\/transylvania_old-morrison_feature.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2021\/11\/transylvania_old-morrison_feature.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":19999,"url":"https:\/\/www.transy.edu\/1780\/2022\/05\/transylvania-to-honor-more-than-200-graduates-at-commencement-ceremony-saturday\/","url_meta":{"origin":19899,"position":1},"title":"Transylvania to honor more than 200 graduates at commencement ceremony Saturday","author":"Office of Marketing and Communications","date":"May 23, 2022","format":false,"excerpt":"Transylvania on Saturday will celebrate 203 graduating students during a commencement ceremony on the lawn of Old Morrison.","rel":"","context":"In &quot;Academics&quot;","block_context":{"text":"Academics","link":"https:\/\/www.transy.edu\/1780\/category\/academics\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_commencement_feature.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_commencement_feature.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_commencement_feature.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_commencement_feature.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2022\/05\/transylvania_commencement_feature.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":6142,"url":"https:\/\/www.transy.edu\/1780\/2019\/05\/transylvania-community-family-friends-celebrate-graduation-of-229-students-saturday\/","url_meta":{"origin":19899,"position":2},"title":"Transylvania community, family, friends celebrate graduation of 229 students Saturday","author":"John Friedlein","date":"May 25, 2019","format":false,"excerpt":"More than 200 graduates crossed the stage in front of the university's iconic Old Morrison administration building to receive their Bachelor of Arts degrees, while family and friends celebrated their many accomplishments.","rel":"","context":"In &quot;Events&quot;","block_context":{"text":"Events","link":"https:\/\/www.transy.edu\/1780\/category\/events\/"},"img":{"alt_text":"Crowd on Old Morrison Lawn","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/05\/drone.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/05\/drone.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/05\/drone.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/05\/drone.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/05\/drone.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/05\/drone.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":2078,"url":"https:\/\/www.transy.edu\/1780\/2016\/02\/mayor-jim-gray-to-deliver-transylvania-commencement-address-2\/","url_meta":{"origin":19899,"position":3},"title":"Mayor Jim Gray to deliver Transylvania commencement address","author":"Office of Marketing and Communications","date":"February 1, 2016","format":false,"excerpt":"LEXINGTON, Ky.\u2014Mayor Jim Gray will give Transylvania University\u2019s commencement address on May 28.The two-term mayor has strong ties to the school, which is dedicated to strengthening its connection to the city. Transylvania and Gray have both shown a strong commitment to Lexington\u2019s Northside Neighborhood in particular. Most recently, Transylvania agreed\u2026","rel":"","context":"In &quot;Events&quot;","block_context":{"text":"Events","link":"https:\/\/www.transy.edu\/1780\/category\/events\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2018\/08\/commencementevent3_0_1.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2018\/08\/commencementevent3_0_1.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2018\/08\/commencementevent3_0_1.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":5923,"url":"https:\/\/www.transy.edu\/1780\/2019\/05\/historic-old-morrison-to-be-featured-in-northside-home-garden-walking-tour\/","url_meta":{"origin":19899,"position":4},"title":"Historic Old Morrison to be featured in Northside Home &#038; Garden Walking Tour","author":"John Friedlein","date":"May 10, 2019","format":false,"excerpt":"Transylvania University will welcome visitors to its iconic Old Morrison administration building for this year's Northside Neighborhood Home & Garden Walking Tour on Sunday, May 19. In addition to spotlighting Old Morrison\u2014which is featured on Lexington's city seal\u2014the self-guided tour will include other nearby properties, including historic homes. Reserve tickets\u2026","rel":"","context":"In &quot;Events&quot;","block_context":{"text":"Events","link":"https:\/\/www.transy.edu\/1780\/category\/events\/"},"img":{"alt_text":"Historic panorama including Old Morrison","src":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/05\/om.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/05\/om.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/05\/om.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/05\/om.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/05\/om.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/www.transy.edu\/1780\/wp-content\/uploads\/sites\/14\/2019\/05\/om.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":2011,"url":"https:\/\/www.transy.edu\/1780\/2007\/05\/transylvania-awards-238-bachelor-of-arts-degrees-to-the-class-of-2007-on-the-steps-of-historic-old-morrison-saturday-may-26\/","url_meta":{"origin":19899,"position":5},"title":"Transylvania awards 238 bachelor of arts degrees to the class of 2007 on the steps of historic Old Morrison Saturday, May 26","author":"Office of Marketing and Communications","date":"May 26, 2007","format":false,"excerpt":"LEXINGTON, Ky.\u2014Transylvania University awarded 238 bachelor of arts degrees on the steps of historic Old Morrison Saturday morning. Family and friends watched from the bright spring lawn as President Charles L. Shearer presented the degrees to the class that included a Fulbright Scholar, political science major Brian Epling, who has\u2026","rel":"","context":"In &quot;Events&quot;","block_context":{"text":"Events","link":"https:\/\/www.transy.edu\/1780\/category\/events\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/posts\/19899","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/comments?post=19899"}],"version-history":[{"count":3,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/posts\/19899\/revisions"}],"predecessor-version":[{"id":19906,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/posts\/19899\/revisions\/19906"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/media\/19903"}],"wp:attachment":[{"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/media?parent=19899"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/categories?post=19899"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/tags?post=19899"},{"taxonomy":"feeds","embeddable":true,"href":"https:\/\/www.transy.edu\/1780\/wp-json\/wp\/v2\/feeds?post=19899"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}